Public Projects

Bids Due in 24 days
1/16/25 2:30pm
24108 - Niles THSD 219 Niles West Fieldhouse Translucent Panel Replacement
Bids Due in 24 days
Studio GC
Bids Due in 24 days
1/16/25 2:00pm
24107 - Niles THSD 219 2025 Niles North Roofing
Bids Due in 24 days
Studio GC
Bids Due in 30 days
1/22/25 11:00am
FPDCC Metal Buildings - McGinnis Field Station
Bids Due in 30 days
Public Building Commission
Bids Due in 21 days
1/13/25 3:00pm
Millennium Hotel RFP
Bids Due in 21 days
SLDC
200 South 4th Street Saint Louis, MO 63102
Gateway Arch Park Foundation (GAPF), the 501(c)(3) nonprofit conservancy and official philanthropic partner of Gateway Arch National Park and its surrounding areas, is seeking information from qualified firms for the opportunity to redevelop the former Millennium Hotel site located at 200 South 4th Street in the Downtown neighborhood of the City of St. Louis, Missouri, which an affiliate of GAPF currently has the contractual right to purchase.
Bids Due in 32 days
1/24/25 5:00pm
AMICSTL
Bids Due in 32 days
SLDC
4300 Block of Finney Avenue
AMICSTL is a non-profit innovation hub in North City St. Louis that will revolutionize advanced manufacturing and elevate the economic, educational, and community visibility and strength of the entire St. Louis bi-state region. The AMICSTL building is planned and documented on Ranken Technical College property between Newstead Avenue and Pendleton Avenue along Finney Avenue. The Ranken properties have been consolidated and recorded. This project is 89,600 square feet which is situated on both the north and south side of Finney Avenue with a bridge connecting the two. There is a 70-foot right of way centered on Finney Avenue. The building will provide flexible spaces to accommodate special project needs, incubator spaces, offices, collaboration spaces, a multi-purpose space, maker space, and an elevated bridge across Finney Ave. Additional project highlights include (4) hi-bay manufacturing areas; mezzanine for offices and meeting rooms; training rooms; lab spaces under the mezzanine; and a self-service cafe. The building height will reach around 55 feet at its highest point above grade and is cladded in three façade types including curtain wall, aluminum composite metal panel, and a translucent polycarbonate system which maximizes daylight while reducing glare.
Bids Due in 22 days
1/14/25 2:20pm
24121 - West Aurora SD 129 2025 Sealcoating
Bids Due in 22 days
Studio GC
Bids Due in 15 days
1/7/25 1:45pm
8782- Concrete & Brick RemovalReplacement and Complete Sidewalk Installation; SP-123
Bids Due in 15 days
SLDC
St. Louis city, Missouri
Replacement of curbs, sidewalk, and other incidental construction within the public right of way related to the City's 50/50 Sidewalk Program. Work can be located in any ward of the City.
Bidding Closed
12/20/24 5:00pm
RFQ Pro. Services Landside Rdwy. and Parking Garage with Ground Trans. Cnt. at STL Lambert Airport
Bidding Closed
SLDC
City of St. Louis
The City of St. Louis, Board of Public Service, is soliciting Statements of Qualifications (SOQ) from qualified firms interested in providing Architectural, Engineering, Design and Construction Phase Support Services for the new Consolidated Terminal Program (CTP) at St. Louis Lambert International Airport (STL or Airport). The Airport seeks a design team, who will under the leadership of a prime firm or joint venture, be responsible for providing Design and Construction Phase Support Services for Landside Roadways and Parking Garage with Ground Transportation Center at St. Louis Lambert International Airport.
Bids Due in 15 days
1/7/25 2:00pm
Spring Bluff R-XV - Additions and Renovations
Bids Due in 15 days
SLDC
9374 Hwy 185, Sullivan, MO 63080
Renovations to the District's existing building: middle school wing HVAC replacements, restroom renovations, finishes replacement throughout, gym flooring replacements, gym bleacher replacement. Additions include construction of two single stall exterior restrooms and expansion to the existing kitchen's cooler / freezer room.
Bidding Closed
12/13/24 5:00pm
RFQ-Traffic Management Enhancements, Phase 7 - South Broadway (Marceau to Carroll)
Bidding Closed
SLDC
City of St. Louis
Proposed improvements will include signal upgrades and/or enhancements, fiber optic interconnect, traffic monitoring cameras, signal timing and optimization, system integration with the City’s Real-Time Transportation Intelligence Center (TIC), and sidewalk improvements as needed for ADA compliance. The project will be generally located along the South Broadway corridor, from Carroll Street to Marceau Street, a distance of approximately 6.10 miles. Additional improvements outside of the South Broadway corridor may be necessary to provide connectivity to the TIC and redundancy to the City’s fiber optic network.